Our method policy

   

  1. Estimator/ Quantity Surveyor make the list of quantity of material required as per approved shop drawing.
  2. Approved list of quantity forward to purchaser to procure the material in specified time as per work program.
  3. Site Supervisor takes the measurement from the site.
  4. Measurement forward to Project engineer to recheck the quantity and sizes as per approved shop drawing.
  5. Approved measurement list forward to production department.
  6. Production dept issue 2 nos. job order for aluminum fabrication and double glazing glass.
  7. Factory formen check the quantity and quality of fabricated material on daily basis and report to production manager.
  8. Project Engineer issue the job order for site fitting of fabricated material.
  9. Transport in charge deliver the fabricated material at site as per job order instruction.
  10. Site Supervisor has given report of site to Project Engineer on daily basis.
 
 
 